Author Archives: eyushadi

W25_EY_Garuda 2015 Class Lesson Learned


Problem Definition At the end of last blog posting for Garuda AACE 2015 Class, even the project was delivered in the optimum time frame, there are still have a lot of lesson learned that need to consider from which we … Continue reading

Posted in Tak Berkategori | 1 Comment

W24_EY_Estimate Project Contingency Using Range Estimating for Project XYZ


Problem Definition After finishing Class 4 cost estimate for Floating Production Facility, project XYZ, as per procedure and estimating process, estimator required to develop cost risk and contingency analysis. In this case Author will do the contingency analysis using range … Continue reading

Posted in Tak Berkategori | 1 Comment

W23_EY_Project Schedule Acceleration Using Network Crashing


Problem Definition Due to timeframe submission of CAPEX Project Cost Estimate had been changed become shorter than actual plan, estimator team requested by Management to check the schedule to accelerate this requirement. Some of the work scope to prepare the … Continue reading

Posted in Tak Berkategori | 1 Comment

W22_EY_Labor Unit Rate Development for Construction Project – Additional Inefficiency Factor


Problem Definition Following up the comment on Blog Posted on W21 with regard to working overtime consideration and the basis of working hour per week which is more than 40 hour a week, in this blog Author will do the … Continue reading

Posted in Tak Berkategori | 1 Comment

W21_EY_Labor Unit Rate Development for Construction Project


Problem Definition Due to bidding process to deliver the complete package of the construction cost estimate. As part of this requirement one of the important thing is the unit labor cost development. In this blog Author will develop what is … Continue reading

Posted in Tak Berkategori | 2 Comments

W20_EY_Cost Budgeting for Class 2 Cost Estimate Preparation Effort


Problem Definition As one part of project development phase requirement to have the next step of cost estimate update for CAPEX Class 2 estimate. Author need to budgeting the cost for class 2 cost estimate. This information will use to … Continue reading

Posted in Tak Berkategori | 1 Comment

W19_EY_Work Breakdown Structure (WBS) Development for CAPEX Cost Estimate


Problem Definition As part of cost estimating plan, before to develop cost estimate one thing that must be develop is Work Breakdown Structure (WBS). Based on this requirement Author will develop the WBS to accommodate CAPEX class 2 cost estimate … Continue reading

Posted in Tak Berkategori | 2 Comments