W25_RD_Lesson Learned (Garuda AACE 2015 Class)


Problem Definition Our Garuda Class is about to finish, with many new things and stories inside it now it times to go bring the experience to the real world. Author lesson learned;  similar with previous class lesson learned, is intended to … Continue reading

Posted in Tak Berkategori | 2 Comments

W24_RD_ Systematic Risk of Shares – Beta Analysis


  1.      Problem Definition Due to current market condition and interested with several article related with the Beta stock as an analysis of systematic risk of shares relative to market risk, then some idea accross our mind, “Hey … why … Continue reading

Posted in Tak Berkategori | 1 Comment

W23_RD_Contract Preparation (Part 7: Bank Loan – Contractor Side)


  Problem Definition Refer to previous blogs, Contractor XYZ planned to funding the Project with 65% from total cost $1,000,000 or $650,000 coming from the Bank Loan. Currently the Commercial Team identified 3 Bank who willing to offer the loans … Continue reading

Posted in Tak Berkategori | 1 Comment

W22_RD_Contract Preparation (Part 6: Go no Go – Owner Side)


Problem Definition From previous blog, Project Team had selected Candidate 3 as a successful Candidate. Next phase is to propose this result to Procurement Committee for go no go decision. Procurement Committee are consist of multidicipline member who responsible to … Continue reading

Posted in Tak Berkategori | 1 Comment

W21_RD_Contract Preparation (Part 5: Candidates Evaluation – Owner Side)


Problem Definition Continue from previous Part 1 on the previous blog, Candidate 2, 3 and 4 had submitted their proposal. Now Team need to do evaluation to find candidate that can meet tender requirement.The expectation is the evaluation result could … Continue reading

Posted in Tak Berkategori | 2 Comments

W20_RD_ Contract Preparation (Part 4: Project Portofolio Analysis – Contractor Side)


Problem Definition After MARR identified in previous blog, now Economist need to analyze the Project whether it will be investable or not based on calculated 15.13% MARR as a discount rate. Currently there are another 2 proposals of with similar … Continue reading

Posted in Tak Berkategori | 1 Comment

W19_RD_ Contract Preparation (Part 3: Minimum Acceptable Rate of Return Analysis – Contractor Side) 


1) Problem definition Refer to current condition, where many bussiness sector in some countries impacted by the oil price matter, Contractor XYZ want to secure their decision to avoid potential lose due to additional risk such as Country Risk. As … Continue reading

Posted in Tak Berkategori | 3 Comments